There will be a water system work day starting at 10:00 a.m. on August 26, 2017. The purpose is to begin to prepare for the 2018 Water System Sanitary Survey conducted by the State of Washington Department of Health.
The priority will be to perform work on the pump house structure and interior plumbing corrosion control. If enough people show up we will do some vegetation removal work on the meter service boxes starting in CV1.
Meet at the pump station near the east cul-de-sac in CV1 at 10:00, bring gloves and eye protection if you have some. I will line out the work based on numbers of volunteers.
To those interested I will demonstrate normal and emergency pumping operations of our system.